A faster, safer and more economical alternative to conventional shuttering.
| Characteristic | Conventional | ALFOAC Aluminium |
|---|---|---|
| Material | Plywood, MS, Timber | Aluminium Alloy 6061 (T6) |
| Cycle time | 15–20 days | 4–7 days |
| Walls, beam & slab in one lift | Not possible | Possible |
| Slab striking without disturbing props | Not possible | Possible |
| Skilled manpower | Required | Not required |
| Plaster | Required | Not required |
| Re-use / repetitions | 8–10 times | 200–250 times |
| Recycle / scrap value | Very low | Very high |
Slow and labour-intensive; not suitable structurally for high-rise.
Common but slow and costly; loses out on mass and large projects.
Suited to large projects but very high initial plant, transport and lifting cost.
Cost-effective, speedy, lightweight, durable, flexible and simple to install.